Offerings - CONTACT US AT (408) 372-6009
UPDATE - THIS ENTIRE DATA CENTER HAS JUST BEEN LEASED !!!
We have other data centers and colocation space to show your firm!
We are a national company and have a database for data center space.
NORTHERN CALIFORNIA DATA CENTER
11085 Sun Center Drive, Sacramento / Rancho Cordova, CA
Data Center users will love this 69,048 Square Foot, Fully Built-Out,
Upgraded Data Center that is truly plug & play and operationally ready
for tenant(s) in January 2010. There is up to 2.74 Megawatts of fully
protected N + 1 power from brand new UPS and battery systems. With
plenty of square footage available, achieve the power/cooling density
your requirement needs. New building automation management system
with ALL DIGITAL CONTROLS, security & equipment control systems
make this a cutting edge data center that will put your firm into the 21st
century.
Located in the upscale corporate community of Rancho Cordova,
among many enterprise data centers such as McKesson, eBay, Qwest,
Barclays Global Investors, Sprint, EDS, Progressive Insurance, Franklin
Templeton, Aerospace General, Sempra Energy and the State of
California main data center, among others. This area is located
approximately 100 miles from most Bay Area locations, but is in a much
less active seismic zone than the Bay Area, LA, San Diego, Seattle &
Portland (approximate to Salt Lake City). This Data Center offers one of
the lowest power costs in California (@ 8.6 cents KwH, it rivals Santa
Clara). Unlike many areas in Sacramento, this Data Center is not in a
flood plain.
WHY SPEND YOUR CAPITAL WHEN YOU DON'T HAVE TO...
Call Bill Minkle at 775-831-6500 for details. or bminkle@telaxis.com
TelAxis Advisors, LLC P.O. Box 5004 Incline Village, NV 89450-5004 (775)831-6500 telephone (775)832-6501 facsimile
@ Copyright 1997-2010, TelAxis, LLC
|
TelAxis Advisors, LLC
The Leading Authority on Data Center & Telecom Infrastructure
Power Specifications:
Two, 12,470 volt power feeds over Redundant Transformers
7000 amps, 480 volt, 3 phase - Six New Battery Strings
New 4000 amp switchgear with new ATS'
Six new UPS Systems / Four - 600KW, Two -500KW
25 PDU's / Low Cost Protected Power at 8.6 cents
From 400KW to 2740KW
4 Different Cooling Systems deliver almost 1000 tons
The Data Center was recently commissioned by Lee
Technologies and all systems were tested and passed. The
PUE was measured using load banks and was 1.567,
without any hot aisle containment, free air cooling or other
efficiency measures that can lower the PUE.